SUSTAINABLE FEATURED PROJECTS

AIRCRAFT MAINTENANCE HANGAR FACILITY

Aviation Classification and Repair Activity Depot (AVCRAD)

Gulfport, MS

$33,351,000

Mississippi Associated Builders and Contractors Merit Award Winner 2020

The Aircraft Maintenance Hangar Facility is a LEED project that consisted of the construction of two (2) helicopter maintenance hangars at the Aviation Classification and Repair Activity Depot (AVCRAD) in Gulfport, MS. AVCRAD is an actively operating facility. Existing hangars and maintenance buildings were used throughout the duration so construction had to be phased to avoid impacting the ongoing operations.

 

The initial site work phase involved the installation of new underground utilities to support the new buildings. Existing paving was demolished in specific areas to accommodate the buildings without affecting access to the existing hangars.

 

The first phase of building construction was Hangar A, which provides storage and protection for the helicopters. This is a 60,000-square foot, structural steel building on auger-cast pile foundations. The skin includes insulated metal wall panels and a standing-seam metal roof. Special features include large, hydraulic panel doors, paint booths, custom-built media/sand blasting areas, and a foam fire suppression system.

 

The second phase was Hangar B, which houses all of the ground support for the airfield operations. It is a 30,000-square foot building with the same foundations, structure, and skin design as Hangar A. Special features include four (4) maintenance shops and a 2-story office area.

Battalion Headquarters Complex

Fort Campbell, KY

$23,838,273

Mississippi Associated Builders and Contractors Merit Award Winner 2015

Orocon–Carothers JV1 was awarded the contract with the United States Army Corps of Engineers, Louisville District for the Battalion Headquarters Complex at Fort Campbell, Kentucky. The project is a fully designed project that consists of the construction of a 16,000 square foot battalion headquarters building, an 87,529 square foot multiple-structure company operations facility, 16,896 square feet of covered hardstands, and associated privately-owned vehicle parking areas. 

The project was completed in 19 months and achieved LEED Silver Certifications on the Battalion Headquarters Facility and the COF Administration Facility.