FEDERAL

FEDERAL FEATURED PROJECTS

HANGAR 5 REPAIRS

Naval Air Station / Joint Reserve Base, Belle Chasse, LA
$1,441,319
Mississippi Associated Builders & Contractors Merit Award Winner 2015
Orocon Construction, LLC recently completed the design-build contract for repairs to Hangar 5 at the Naval Air Station / Joint Reserve Base in Belle Chasse, Louisiana. This hangar sustained significant differential building settlement between the original hangar and the 1996 addition. Due to this building settlement, the interior flooring at the addition began cracking, and three exterior curtain walls began to fail causing them to pull away from the building. Orocon Construction teamed-up with Allred Architectural Group in an effort to provide a design that would restore the exterior envelope and repair the interior to deliver a complete and usable facility.  

Tactical Equipment Maintenance Facility (TEMF)

Millington, TN
$9,823,045
Mississippi Associated Builders and Contractors Merit Award Winner 2013
Orocon-Carothers JV1 completed this $9,823,045 contract awarded by United States Army Corps of Engineers, Louisville District for the Design and Construction of the new Tactical Equipment Maintenance Facility at Millington, Tennessee. The facility contains repair and maintenance areas, administrative offices, and ancillary spaces.

The new repair facility is approximately 39,000 square feet with over 200,000 of concrete hardstand on a 19 acre site. 

The facility accommodates the mission and staffing of approximately 23 full-time mechanics and support staff, as well as about 60 weekend Army Reservists. The facility provides adequate parking space for all military and privately-owned vehicles, and will comply with DOD minimum antiterrorism force protection construction standards.

This project meets LEED Silver standards.

OTHER FEATURED PROJECTS

Battalion Headquarters Complex – $23,800,000
Ft. Campbell, KY
performed by Orocon-Carothers JV1
Building 603 Saufley Field Renovation - $33,219,395
Naval Air Station, Pensacola, FL
performed by Orocon-Carothers JV1
Defense Logistics Agency Communications Building - $12,348,716
New Cumberland, PA
performed by Orocon-Carothers JV2
Historic Buildings Renovation - $23,217,024
Ft. Leavenworth, KS
performed by Orocon-Carothers JV2 
Various Roofs - $998,596
Naval Construction Battalion Center,
Gulfport, MS
Building 400 Roof Replacement - $847,864
Naval Construction Battalion Center,
Gulfport, MS
Building 323 Embark Staging Area - $592,377
Naval Construction Battalion Center,
Gulfport, MS
NAVO Concrete, Buildings 1002, 1003, 1032 - $204,523
Stennis Space Center, MS
NOAA / SEFSC Miami Lab Reception Area- $207,970
Miami, FL
New Orleans VA, PanAm Building Concrete Package - $1,213,338
New Orleans, LA
US Penitentiary Roof Package - $5,397,688
Yazoo City, MS 
Addition to Building 0222 - $496,208
Keesler Air Force Base, Biloxi, MS
Share by: