|
Client
Killian Construction Co.
Owner
Palace Casino Resort
Contract Value
$2,061,400
Completion Date
May 2011
|
|
|
Palace Casino Resort Expansion Concrete
Orocon is working as a major subcontractor on this project providing a turnkey concrete package for a 110,000 existing resort. Work includes all structural concrete foundations, columns, walls, slabs on grade and slabs on metal deck, as well as site concrete with over 75,000 sf of paving.
|
|
|
Client
Yates Caddell
a joint venture
Owner
Federal Bureau of Prisons
Contract Value
$3,407,000
Completion Date
November 2011
|
|
Yazoo City United States Penitentiary Roof
Orocon is teaming with Independent Roofing Systems out of Jackson,MS to provide the roofing on this $200 million federal prison. This LEED certified project includes 475,200 square feet of modified bitumen roofing as well as metal wall panels, skylights, roof hatches, and associated sheet metal flashing.
|
|
|
Keesler Air Force Base
Biloxi, MS
Client
USAF 81st Contracting
Squadron
Contract Number
FACA3010-10-C-0009
Contract Value
$475,500
Completion Date
April 2011
|

|
Building 0222 Addition
The contract is for a 3,000 sf addition to Building 0222. Work includes relocation of utilities, new concrete foundations, structural steel and light-gauge wall and roof framing, with a standing seam metal roof and brick veneer to match the existing building.
|
|
|
Naval Construction Battalion Center
Gulfport, MS
NAVFAC Southeast
Contract Number
N69450-10-C-3600
Contract Value
$116,420
Completion Date
January 2011
|
|
|
Building 435 Armory Weapons Washer Addition
This design-build contract was for a new roof addition to the existing armory to provide a covered area for two weapons washer units. Work includes demolition, concrete, steel structure, metal roofing and wall panels, mechanical and electrical.
|
|
Stennis Space Center, MS
Client
NAVFAC Southeast
Contract Number
N69450-10-C-3589
Contract Value
$392,938
Completion Date
January 2011
|
|
|
Repair Training Tank at SBT-22
This contract was for interim repairs to the training tank to resolve ongoing problems with this 14,000 sf pool. Work includes removal andreplacement of edge coping, waterline tile, and the surrounding concrete deck, as well as leak detection and repair.
|
|
Naval Construction Battalion Center
Gulfport, MS
Client
NAVFAC Southeast
Contract Number
N69450-10-C-3565
Contract Value
$558,000
Completion Date
July 2010
|
|
|
Building 361 Repair
This contract was for exterior repairs to an existing gymnasium at the Naval Construction Battalion Center in Gulfport, MS. Work included the removal and replacement of exterior window systems to meet building code and anti-terrorism force protection requirements and the metal roof system was upgraded to meet current code requirements.
|